during the week kent sms visited a site in the harrow weald that is to be the location for 14 apartments & four houses. yoop architects have designed the scheme commencing with a super-insulated fabric and solid block.
it has no need for renewables but does have a whole house heat recovery system which should see it achieving a code level 5. there has been a great attention to detail with the inclusion of a wildflower garden, native hedging and appropriate trees as advised by really wild flowers kent sms was very impressed with the construction director gerry lennon of sandwood who are the design & build company undertaking the construction of the project which is expected to complete by august 2o12
- BROWSE / IN TIMELINE
- « adjaye on architecture
- » a close call
- BROWSE / IN Business Strategic Marketing
- « RIBA members
SPEAK / ADD YOUR COMMENT
Comments are moderated.

